Commercial Portfolio

Deep dive into Makli Mechanical's most complex and demanding infrastructure projects across the Greater Toronto Area.

HVAC

High-Rise HVAC Grid

A complete vertical HVAC integration for a new 45-story commercial tower in downtown Toronto. The project required hoisting three massive 500-ton chiller units to the reinforced rooftop structural grid using specialized heavy-lift helicopters. We routed the primary ventilation shafts and implemented a fully automated smart-building climate control system.

1,500 Tons
Cooling Capacity
14 Months
Completion Time
0
Safety Incidents
Plumbing

Municipal Water Facility

Contracted by the city to overhaul the primary pumping mechanisms for a regional water treatment facility. This involved the installation of massive 48-inch steel mains, high-pressure filtration plumbing, and emergency overflow bypass valves. The system now processes clean water for over 150,000 residents with state-of-the-art leak detection sensors.

48 Inches
Pipe Diameter
50M Gallons
Daily Output
1,200+
Welding Joints
Mechanical

Industrial Boiler System

Replaced an aging, inefficient heating infrastructure for a massive automotive manufacturing plant. We installed a cascading network of four high-efficiency industrial boilers. The new mechanical room was completely fabricated off-site, transported, and integrated during a planned 72-hour factory shutdown, resulting in zero lost production time.

20M BTU/h
Thermal Output
35%
Efficiency Gain
72 Hours
Downtime
HVAC & Plumbing

Commercial Retail Build-out

A fast-track, full mechanical fit-out for a flagship 100,000 sq ft retail store. This project required exposed, aesthetically pleasing spiral ductwork painted to match the brand's interior design, alongside public restroom plumbing arrays built to handle massive foot traffic. We delivered the project two weeks ahead of the grand opening.

100k Sq Ft
Footprint
3.5 Miles
Ductwork Length
2 Weeks Early
Schedule
Infrastructure

Subterranean Pipe Network

A complex underground trenching and piping operation beneath an active university campus. We laid a high-pressure steam distribution network to heat five historic buildings from a central cogeneration plant. Extensive ground-penetrating radar was used to carefully avoid cutting massive existing fiber optic trunks.

15 Feet
Trench Depth
150 PSI
Steam Pressure
5
Buildings Connected
Mechanical

Heavy Facility Retrofit

Modernizing a 1960s-era steel fabrication warehouse with modern, code-compliant ventilation and exhaust systems. We installed massive rooftop extraction fans to safely pull welding fumes and metallic dust from the facility floor, drastically improving the air quality and safety for the 300+ union workers inside.

12x per Hour
Air Turnover
14 Units
Fans Installed
Exceeds OSHA
Code Status
HVAC

Corporate HVAC Network

Fitted a luxury corporate headquarters with variable refrigerant flow (VRF) systems, allowing for individualized, zone-by-zone climate control across hundreds of private offices. We integrated the entire HVAC network into the client's proprietary building management software for real-time energy monitoring.

120
Climate Zones
$40k/Year
Energy Savings
VRF
System Type
Plumbing

Stadium Plumbing Grid

Designed and installed the plumbing grid for a 20,000-seat minor league sports stadium. The challenge was designing a pressure system capable of handling extreme simultaneous usage during halftime breaks without causing destructive water hammer effects across the massive stadium grid.

450+
Fixture Count
2,000 GPM
Peak Flow
Eliminated
Water Hammer
Specialty

Bio-Tech Lab Piping

An ultra-precise medical gas and cleanroom plumbing installation for a pharmaceutical research laboratory. We ran miles of orbital-welded stainless steel tubing for oxygen, nitrogen, and specialized vacuum lines. The entire facility was constructed under extreme cleanroom protocols.

ISO Class 5
Cleanroom Standard
O2, N2, Vacuum
Gas Lines
99.99%
Weld Purity
📞Emergency Call